The unloading of the Grà
Moghegno
13.11.2025
Search on ascona-locarno.com
Moghegno
13.11.2025
The unloading of the grà takes place about three weeks after the loading, whatever the weather. It is usually done between late October and mid-November.
The unloading involves putting the still warm chestnuts in long canvas sacks and beating them repeatedly with logs until the skins of the chestnuts begin to shatter. The chestnuts are then separated from the remains of their skins and cleaned by hand before being returned to their owners. Every year, instructors from the Centro Natura Vallemaggia, in partnership with the APAV, the 7th district Ufficio Forestale and volunteers provide educational activities for schools local to the Moghegno grà, including the beating of the chestnuts, the chestnut weevil, the mill at which some of the dried chestnuts are made into flour, the grà, the torba, chestnut woods and an entertaining story.
More about the loading of the grà